 |
- Price
List
Updated April 14, 2025
-
Quickship
Catalog
Updated February 7, 2025
Prices, policies, shipping, and lead times are subject to change without prior
notice.
|
|
|
|
|
WHAT YOU NEED TO KNOW NOW |
[02/20/25]
Please know that Lead Times are subject to change at any time.
Model Number |
Lead Time |
AFC48, LCE/LCS/LE/LS 42 and Larger, DFE/DFS 42 and Larger, DDE/DDS 42 and
Larger, TDB, TDD, UBB/UBS/UBX/UBRD, HRSB/HRSD, HREB-C/HREB-P/HRED-C,
UBSRD/ UBSRD-P, SMXD/SMXD-K, CTB, TUB
| 5 Weeks |
GED/eGED, LCE/LCS/LE/LS 36 and Lower, DFE/DFS 36 and Lower, DDE/DDS 36 and
Lower
| 4 Weeks |
reFresh - RF |
3 Weeks |
CM, CFD, SDB/STXB 20 and Larger, KSFV, CSF, SQB 24 and Larger, RFC |
3 Weeks |
SQD/ eSQD, SQB 20 and lower |
3 Weeks |
SDB/STXB 18 and Lower, STXD/STXDe (See EC Motor lead time exception below)
|
3 Weeks |
SDBD/ SDBDe, LPD, CWD, RCXII, RLX, ARE (See EC Motor lead time exception
below) |
3 Weeks |
Jet Fans - IFFT/ IFFTe, TJFU, IFAB/IFEB |
7 Weeks |
BGH (Special Roof Curbs) |
4 Weeks |
Individual Parts/Fab - Please email custserv.jax@solerpalau.com
for details. |
2-4 Weeks |
Lead Times Are Subject To Unexpected Change.
- Standard Delivery Cycles are to be used as a guideline only for
estimating/coordinating deliveries. Please be aware that Deliveries Cycles are ever-changing.
- Estimated Delivery Cycles and Lead Times will be sent via e-mail/fax
or phone within 48-72 hrs. (excluding weekends/holidays) of placing your Purchase Order. Please know
that dates are estimates only and can change at any time.
- Delivery Cycles and Lead Times are for catalog items only. You must
contact the Support Services for special units or custom orders which will require longer delivery
cycles and lead times.
- Delivery Cycles are for standard order sizes of 25. Email Support
Services for larger jobs. Add one week for painted orders.
- Delivery Cycle and Lead Times begin after receipt of order and credit
approval.
- Delivery Cycles and Lead Times are in business days, excluding
holidays and special company events.
[02/17/25] - TR/ERV Lead Times
All TR/ERV orders require a custom freight quote. These products are excluded from S&P USA's Free
Freight Allowed (FFA) Program. See lead times below. Lead Times are specific for 1 unit only.
SIZE |
WKS |
TRCeN500-TRCeN800 |
5 |
TRC-1200, TRC1600, CA |
6 |
|
|
RES (< 1 pallet)
|
1 week
|
RES (2+ pallets) |
2 weeks+ |
The commercial unit table assumes a single unit. Orders of custom units / multiple units /
larger quantities may increase lead times from above.
|
In order to help offset increasing costs and stay aligned with industry trends, S&P USA
Ventilation
Systems LLC is announcing an increase in our Free Freight Allowed (FFA) threshold for purchases of
residential products from the current $1750.00 net price to $2000.00 net price.
Beginning January 1, 2025, freight charges will be added to any residential product orders totaling
less than $2000.00 net price.
|
|
|
Please be advised that the following sizes of our Losone Select Series can no longer be built in
Optisizer: L100E, L150E, L200E, L250E, L300E, L100EL, L150EL, L200EL, L250EL, L300EL
These sizes can be ordered through "add stock". For instructions on how to use the "add stock" feature,
please reference our FAQ Page.
To view specifications for the Losone Select Series, please visit our Website.
|
If some of the products on your order have a longer lead time and you would for products with a shorter
lead time to ship first, please follow the steps below to opt for partial shipments.
1. Click the 'projects' tab, found under 'project management'
2. Check the box next to the order you would like to split
3. Select 'Order' from the options at the top of the page
4. Find 'Allow partial shipments?' at the bottom of this page and select 'yes' from the drop-down
5. Click 'Place Order'
PLEASE NOTE: This gives S&P USA permission to ship some products earlier if other products on the same
order have longer lead times. This may also result in multiple invoices sent for the same order.
|
Please be advised due to supplier challenges, our SCR-10/SCR-15 Vari-speed control is being replaced by
another brand. The ratings and the function of the switches are the same. However, the new switch does
not have a ground wire. It uses the body of the switch to ground the box it is placed. The new switch
does require a screwdriver to adjust speed.
|
S&P USA Ventilation Systems LLC (S&P USA),
a leader in the sales and distribution of HVAC air movement products throughout North America, is pleased to announce another expansion of it renowned
Quickship delivery program.
|
S&P USA Ventilation Systems LLC (S&P USA),
a leading provider of HVAC air movement and ventilation solutions, is excited to launch our latest
accessory: the BACnet Fan Control.
This new device seamlessly connects
S&P
USA energy recovery ventilators (ERVs)
with a
building management system (BMS)
or
building automation system
(BAS).
|
S&P USA Ventilation Systems introduces
the TRC Rooftop ERV series, featuring high-efficiency energy
recovery ventilators (ERVs) for commercial applications. These units offer advanced moisture transfer
technology, superior energy recovery, and easy installation. Available in various models to suit
different needs.
|
|